FERC: PG&E Interconnection Reform

Reason for Submission: Protest to utility proposal

Download Comments (PDF)

Protest of PG&E Interconnection proposal, highlighting the unreasonable length of the proposed new process and the inadequacy of the “accelerated options” proposed to mitigate this length.